Root Cause #027: Excess Baggage

Root Cause / Episode 027 / Scope and delivery

One small feature is joining Friday’s release. Its dependencies have apparently booked the entire cargo hold.

Four-panel comic. A small release suitcase grows into a cargo-plane load of dependencies while Brian holds its unchanged Friday deadline tag.
Root Cause #027 · Another perfectly normal day in IT.
Panel 1. The Manager asks to add a small feature to a release suitcase tagged Friday; Brian asks what it needs.

Panel 01 / 04

Panel 2. Patch presents crates labeled Dashboard, Approvals, and Payroll beside the small release suitcase.

Panel 02 / 04

Panel 3. The Manager and Brian look up at an enormous strapped tower of cases and crates.

Panel 03 / 04

Panel 4. Brian holds the tiny Friday tag as a cargo plane is loaded with the expanded project.

Panel 04 / 04

Read the transcript

Panel 1. The Manager and Brian stand by a small open suitcase marked RELEASE, with a FRIDAY luggage tag. The Manager: “Can we squeeze one small feature into Friday’s release?” Brian: “What does it need?”

Panel 2. Patch gestures to a trolley of crates marked DASHBOARD, APPROVALS, and PAYROLL. The release suitcase stands beside them. Patch: “A dashboard, approvals, and a connection to payroll.”

Panel 3. The original release suitcase sits at the base of a huge strapped tower of cases and crates, filling the office. The Manager: “That’s more luggage than I expected.”

Panel 4. A cargo airplane is being loaded with the enormous project shipment. Brian holds the tiny FRIDAY tag and his cyan mug while the Manager watches. Brian: “At least the deadline hasn’t gained any weight.”

Meet the regulars

Brian

Solves infrastructure. Still waiting on requirements.

The Manager

Sees the possibility. Occasionally, the scope.

Patch

Helpful. Literal. Technically followed instructions.

Share this article